Serving The Jersey Shore, Lakewood, Brick, Wall Township
In Business Since 1984
Click on a photo to enlarge.
This client in Allentown, NJ contacted YES Contractors to open their above-ground swimming pool for the season. The crew removed the winter cover, reassembled the pump and filtration equipment, and removed all winter plugs. They tested the system for leaks and applied all the necessary chemicals to the pool. After completing those steps, our team folded the cover and stored it in the client's desired location. Another job well done, thanks YES!
This client in Manchester Township contacted YES Contractors to close their in-ground pool. We sent Matt, our Maintenance Tech, out to get the job done. Matt completed every step of the process. He winterized the plumbing lines, plugged the returns, and cleaned the filter media. He removed the ladder and handrails and stored them in the client's shed. Lastly, Matt added all the necessary chemicals and installed the pool cover. In no time at all this pool was winter-ready!
This client in the East Windsor area contacts YES Contractors every year to open and close his above-ground swimming pool. Our team completes every step of the process. To close the pool they blow out the plumbing lines, plug the skimmer and return, clean the filter media, and cover the pool. When they return for the opening our team removes the cover and all the winter plugs, adds the proper chemicals to the pool, and tests the system for any leaks. This client can relax in his swimming pool all summer long after saying “yes” to YES!
This client in Hightstown contacted YES Contractors to take down, remove and reinstall an above ground pool. His existing pool had faded from years of use and he decided it was time for a new one. Our team completed every step of this job and in no time the client's new pool was up and running!
This client in Forked River, NJ contacted YES Contractors to close their pool for the winter. Our Winterized this above ground pool to ensure it wouldn't be green when opening it next season. Winterization consists of proper sealing of the plumbing lines, clean out any leaves and debris, adding all the necessary chemicals to the water, and last but not least secured the cover. This closing was complete.