Unloading the Truck
The pool came in three sections and each one required its own truck for transporting. The truck drivers took turns backing down the long driveway so their section of pool could be reached by the crane and lifted off.
Section #1
This was the first section to be placed in the pools temporary location. There was a lot of work required before the pool could be set in place.
Section #2
Between the crane operator and men on the ground, the second section needed to be placed just right to continue work. Once the second piece was aligned and placed the crew got to work bolting the peices together.
Section #3
After the third section was aligned and placed, it was time to bolt them together again. In addition, we needed to add any additional piping while the entire outside of the pool was still easily accessible.
Lifting and Placing
Once everything was attached together, it was time to lift the pool again, this time fully assembled.
Overhang
With its spillover design, this pool is built to overhang approximately 4 feet beyond the edge. Since it's a fiberglass pool, it's lightweight enough to accommodate this design and be elevated off the ground, as shown here!
Successfully Moved
Now that the pool has been successfully moved into place, we can make any final adjustments before moving onto next steps in the project.
Next Steps
While this property went from no pool to having a pool in just one day, there are still plenty of finishing touches and work needed to bring this project to completion! Stay tuned for more updates on this project in the months to come!