Excavation and First Steps
Our crew got to work helping this client select the right pool and location that followed all town regulations.
Walls Up and Liner Going In
Step by step this above-ground pool was taking shape. After completing the sand base the walls went up and the liner was going in.
Time to Fill
Once the liner is secured and the pool is fully assembled, it's time to begin filling the pool. The homeowners are given clear instructions on the proper water level to ensure everything is ready for the next step.
Installation Complete
Once the desired water level was met we were able to complete the job. We returned to backfill, install the skimmer, and officially wrap this installation up.
